PronttoProntto
All success storiesDealers, Distributors & Showrooms

ScavoliniNamed client

Scavolini: How the Italian design authority uses Prontto

Scavolini used Prontto to unify presentations, technical drawings, and proposal production across Miami, New York, and Las Vegas.

ClientScavolini
Outputs4 production lines
Scope20+
CategoryRetail Stores
Scavolini: How the Italian design authority uses Prontto card image
Kitchen proposal visuals / Retail Stores / Las Vegas, New York, Miami
SIn their words

“Prontto has revolutionized our workflow. Now, our designers can focus on clients while Prontto handles the rest. It’s a game-changer.”

S

Scavolini

The arc

From a bottleneck to an organized production path.

01The challenge

Scavolini needed consistent visual and technical production across independent teams, time zones, local codes, and showroom workflows.

02What Prontto did

Prontto provided 3D renderings, CAD drawings, centralized request management, and recurring production support.

Structured requestsRecurring capacityBrand-consistent output
03What changed

Designers could focus more on client interactions and sales while Prontto handled proposal development and technical documentation.

Kitchen proposal visualsTechnical drawingsCentralized request workflowPresentation support

Delivered

Production lines, organized in one workflow.

Kitchen proposal visuals / Technical drawings / Centralized request workflow / Presentation support

Client context

Scavolini

Scavolini has been a leader in kitchen design for over 60 years, evolving from a small craft-based business into a major industrial force. With a keen eye for changing tastes and trends, Scavolini has consistently demonstrated innovation in response to market demands and technological advancements. Their commitment to public satisfaction and local needs has made them a model of production development in the kitchen sector.

Snapshot

LocationLas Vegas, New York, Miami
Team size20+
DateApril 2021
CategoryRetail Stores
Visual & Spatial ProductionTechnical & Fabrication DocumentationDealers, Distributors & Showrooms

Success highlights

The work translated into visible operational wins.

01

Streamlined the process for designers, allowing them to focus on client interactions and sales.

02

Handled all technical drawings, adhering to local codes and preferences.

03

Unified presentations across all locations, ensuring consistent and professional visuals.

Story arc

The full story, broken into the decisions and shifts that mattered.

01

Overview

Scavolini, a renowned name in Italian kitchen design, faced operational challenges with their US branches located in Miami, New York, and Las Vegas. With a team of 20 designers spread across three different time zones, they struggled with the unification of presentations, technical drawings, and meeting diverse local codes and preferences. Prontto stepped in to streamline their processes and enhance their efficiency.

02

Background

Scavolini’s US operations required a cohesive strategy to manage the unique needs of each location while maintaining the high standards of their Italian headquarters. Each city’s distinct culture and working methods, coupled with the technical demands of kitchen design, presented a significant challenge for their independent teams.

03

Challenges

- Time Zone Differences and Independent Teams: Scavolini’s US branches operated independently across different time zones, leading to a lack of unified support for technical drawings.

- Need for Unified Presentations and Drawings: Each store functioned independently, resulting in inconsistent presentations and technical drawings.

- Diverse Local Codes and Design Preferences: Each city had its own building codes and design preferences, making it difficult for an in-house team to cater to all needs.

- Split Focus for Designers: Designers were dividing their time between creating sales opportunities and developing client proposals, which hindered their ability to maximize sales potential.

04

Prontto Stepped In

Prontto addressed these challenges with tailored services that streamlined Scavolini’s operations:

- 3D Product Rendering Services: We provided high-quality 3D renderings that unified the visual presentations across all locations, ensuring consistency and professionalism.

- CAD Drawings: Our team handled all technical drawings, adhering to local codes and design preferences, which allowed Scavolini’s designers to focus on client interactions and sales.

- Centralized Request Management: By using our web-based platform, Scavolini’s sales associates could easily submit requests for renderings and technical drawings, ensuring quick and efficient turnaround times.

- Architectural Subscription Service: Our subscription model provided continuous support, ensuring that Scavolini had access to skilled professionals without the need for extensive in-house training and retention efforts.

05

Through Our Partnership, They Achieved

- Increased Efficiency: Sales associates now focus solely on client opportunities and relationships, while Prontto handles the development of proposals and technical drawings.

- Consistent Quality: Unified presentations and technical drawings across all locations, adhering to local codes and preferences.

- Maximized Sales Potential: With the linear process removed, designers are no longer halted by proposal development, allowing them to pursue more sales opportunities.

Prontto’s partnership with Scavolini has transformed their US operations, allowing them to maintain high standards while efficiently managing diverse needs across multiple locations. This collaboration ensures that Scavolini’s designers can focus on what they do best: creating beautiful, functional kitchen spaces for their clients.

We invite you to explore our plans and pricing to learn more about how Prontto can support your business.

Project assets

Visual proof from the success story.

Watch walkthrough

Apply this to your workflow

Bring one production bottleneck. See how Prontto would handle it.

Use Scavolini: How the Italian design authority uses Prontto as a reference point, then start with one real request from your own team.